The plans for the Elwood Logistics Airport include a highly innovative plan to leverage under-utilized adjacent warehouse capacity to enable a fifth cargo terminal. By developing a dedicated rail line to operate primarily on the airport property, additional cargo terminal capacity can be available for a expanded operations of existing customers or to enable a fifth cargo carrier to provide service to Elwood Logistics Airport.
An existing currently underutilized adjacent warehouse with an available rail dock is poised to provide equivalent capacity as any of the four planned KEWL terminal cargo facilities. Shown in the image above, the Phase 1 alignment includes the Airside Rail Docks at the west end of the North Terminal complex. Three tracks enable rail cars to be positioned close to the ramp area. A single track follows from the North Terminal Complex along at a southwest direction to adjacent with the off-site Terminal with two switches installed in anticipation of Phase 2 track structure.
The initial phase of the KEWL Rail-Link operating plan includes rolling stock in fly KEWL livery for a switching locomotive and eight (8) refurbished boxcars. The eight boxcars will enable phased shuttling of freight between the aircraft and the off-site terminal in four (4) car consists, which is the current capacity of the warehouse rail spur and loading dock. The in-bound concept would consist of unloading the aircraft into four boxcars which would be shuttled over to the warehouse to be unloaded, while the next four cars are loaded plane-side. This process would be repeated for the extents of the in-bound cargo. A similar process would be used for loading out-bound cargo.
Once available, the process is to transition to state-of-the-art specialized railcars for directly handling air cargo containers, or Unit Loading Devices (ULDs) to increase the speed of transfer from arriving aircraft to the offsite terminal facility for processing, or reverse.
KEWL Rail-Link has acquired ten (10) cars formerly used by the Boeing Corporation to transport fuselage sections for their 767 and 777 model aircraft (below-top, in use at the Boeing Everett Plant). Currently a prototype car has been developed by modifying these cars with a single side door to accommodate six double stacked racks of pre-loaded ULD containers. Initial tests of the prototype car indicate a significant reduction in loading/unloading times and expect to result in aircraft turn times similar to those of on-site cargo terminals.
After the initial KEWL Rail-Link proves to be successful, a Phase 2 concept is to add an additional rail yard designed for supporting additional rail operations. This expansion would include developing a rail yard at the southwest corner of the ELA property, and acquire additional land along the northside of Hoff Road for right-of-way and trackage. This single track would extend from the proposed rail yard to cross the intersection at IL Route 53 and Hoff Road and turn left intersecting the Union Pacific - Joilet Subdivision main line. The right-of-way will include two separate grade crossings: (1) a rarely used used auto-only access road between Hoff Rd. and the logistics terminal shared with Linkerover (Phase 1), and (2) a reinforced grade crossing (to account for the commercial truck traffic) at the IL-53 and Hoff Rd intersection.
Still in the conceptual planning and coordination phase, planned shuttle operations would use the connector line to offer rail service directly into the CenterPoint Intermodal Center, there by connecting the airport terminal and rail-dock equipped distribution centers. At present, this shuttle service is only in the planning stages and requires further coordination with Centerpoint Properties, Union Pacific and BNSF Railroads for permission to operate on respective segments of their existing tracks serving those distribution centers.